June 1, 2023 | Long Lake, NY
On job 24265 in Lexington we bagged saturated finishes and cleaned framing. The unique on-site tell was Old Cherokee Road staging plus a pin grid that mapped the wet edge with infrared then pins. Equipment ran inside a 3–7 day band with overnight humidity checks—never a multi-week campaign. Photo documentation stayed ...
Total: 1477