July 21, 2023 | Williston, VT
On job 24920 in Goose Creek we mapped the wet edge with infrared then pins. The unique on-site tell was St. James Avenue staging plus a pin grid that HEPA-vacuumed demo dust before rebuild handoff. Equipment ran within a 3–7 day meter window with overnight humidity checks—never a multi-week campaign. Photo ...
Total: 1477